Home/Case Studies
Case StudiesEvery figure has a baseline, a window and a stated basis
Each case states the pre-retrofit baseline, the measurement period and the production conditions. Where consent wasn't given the customer is anonymised — but the industry and the data are just as real.
These are layout placeholders — verified figures will replace them before launch
Case Studies
Savings proven by before-and-after data

Electroplating · East China (anonymised)Model: EMCIllustrative case · figures pending confirmation
Fan system retrofit for an electroplating park's waste-gas treatment
Before · annual consumption
704 MWh
4 × 22 kW fixed-frequency belt-driven fans
After · annual consumption
443 MWh
4 × 3rd-generation intelligent fans
Overall saving
−37%
≈ ¥196k saved per year
Before · annual consumption704 MWh
After · annual consumption443 MWh
Overall saving · ≈ ¥196k / year−37%
Baseline: 3 months of platform measurement before the retrofit · Period: Oct 2025 – Jan 2026 · Conditions: three-shift continuous production (Layout placeholder — replace with verified figures before launch)
Chemical · East China (anonymised)
−41%Overall saving*Acid-mist tower retrofit
6 months · pending
6 months · pending
PCB · South China (anonymised)
−36%Overall saving*Etching-line exhaust upgrade
4 months · pending
4 months · pending
XX
Retrofit projects delivered
Figures pending
XXX units
Units in operation
Figures pending
XXX units
Connected to smart O&M
Figures pending
XXX MWh
Verified energy saved
Figures pending
What Qualifies as a Case
What a project needs before it appears here
01
A measured baseline
Pre-retrofit consumption is measured and recorded — no estimates standing in for data
02
A full measurement window
Complete measurement periods before and after, with start and end dates stated
03
One consistent basis
Saving rate, kWh saved and cost saved all calculated on the same basis
04
Customer consent
Published details are authorised by the customer; without consent the case is anonymised but the data is real
Want an estimate for a site like yours?
Tell us the industry, power rating and operating hours, and we'll produce a preliminary estimate on the same basis as these cases.

